Choose font size
 
BSE 272.95 (+5.15)
NSE 271.10 (+2.55)
  Quick Link
NSE Market Tracker Search  
 
"The purpose of life is a life of purpose."
Robert Byrne
ARCHIVES
Discussion Forum
ASURA in top 4. Thank you
Happiness is the key of ev...
 Most Viewed in the Month
DRESS CODE FOR WOMEN EMPLO...
Lease
Editor’s Mailbox
Annual Winter Stocking to ...
User ID and Password for I...
Xpress Poll
Will Aamir Khan's 'Satyamev Jayate' be able to bring a social change in India?


Last week's Poll results
 
Performance Highlights (Refineries Division)
Last Updated: April 06, 2010
  • IndianOil Refineries once again crossed the 100% capacity utilisation mark during 2009-10.
  • IndianOil Refineries achieved crude throughput of 50.7 MMT during fiscal 2009-10 registering overall capacity utilization of 102% with coordinated efforts of Corporate Office, Marketing, Pipelines, and Refineries Divisions for evacuation of the products.
  • Overall capacity utilization was more than 100% for the third year in a row despite planned revamp / M&I shut downs for implementation of quality up gradation projects in all the Refineries.
  • Optimum operation of Secondary units at all IndianOil Refineries through timely catalyst skimming /replacing catalyst wherever required, minimizing down time etc., has enabled Refineries in achieving the highest combined distillate yield of 75.2 wt% for two years consecutively.
  • Barauni and Panipat Refineries have recorded the highest ever distillate yield of 86.9 wt% and 80.7 wt% respectively.
  • Barauni and Panipat Refineries achieved highest-ever crude throughputs of 6186 TMT and 13629 TMT respectively surpassing the previous best of 5940 TMT (2008-09) and 13067 TMT (2008-09) respectively where as Guwahati Refinery achieved the highest throughput of 1076 TMT for second consecutive year (1075.7 TMT in 2008-09).
  • Capacity utilization of Guwahati, Barauni, and Panipat Refineries was 108%,103 % and 114 % respectively.
  • Guwahati Refinery achieved highest DCU throughput of 414.9 TMT for second consecutive year (414.7 TMT in 2008-09).
  • Barauni Refinery achieved highest ever FCCU throughput of 1501 TMT surpassing the previous highest of 1454 TMT (2008-09).
  • Panipat Refinery achieved highest ever HCU/OHCU combined throughputs of 3693 TMT surpassing the previous best of 3629 TMT (2008-09).
  • Naphtha Cracker Unit at Panipat - Feed cut in for IndianOil's first and India’s largest Naphtha Cracker Unit has been done on March 11, 2010. This is the sixth Naphtha Cracker Unit and the largest single train Naphtha Cracker Unit of the country
To view the complete highlights please click here
Archives
Copyright © Indian Oil Corporation Ltd. indianoilquery@gmail.com